13560710910
Search

Application of glue filling machine to LED flexible light bar

2020-11-06   

LED flexible light bar is also known as LED light strip. The flexible light bar is to weld the LED patch on the flexible circuit board, and install it in the form of adhesive back on the back. According to the different requirements of the application, the surface Carry out the glue filling and waterproof treatment. The soft light bar glue filling machine is mainly used in the light bar potting in the LED optoelectronics industry. It uses machine glue to replace manual glue, so as to realize automation. Glue filling machines have been widely used in various industries, but different glue filling products have certain differences in application.

1. Before the soft light bar is filled with glue, the glue must be defoamed. It is recommended that the defoaming time is 6-8 minutes. When there is glue filling, turn on the vacuum system of the light bar glue filling machine.

2. When the LED flexible light bar is produced, the glue does not dry out. The primary reason is the inaccurate glue ratio or uneven mixing. Before filling the glue, in the software control system of the light bar glue filling machine, set up various parameters, and then use a disposable cup to test, such as only opening A glue, 10 seconds, what is the amount of glue, and then only For B glue, what is the glue quantity at the same time, weigh it with an electronic scale, if there is a deviation, correct the parameters, when the adjustment is to a suitable ratio, the automatic glue filling can be planned. If the glue is not uniformly mixed, it will appear dry, partially dry, or the curing time will be longer. Check the mixing tube and replace the type of mixing tube; if it is static mixing, try it instead.

3. After the glue is completely cured, the appearance will be a little sticky, please do not reel and pack it within 24 hours.

4. Since the LED light bar uses a flexible circuit board, it is relatively soft. When the glue is processed, the light strip must be fixed and leveled with a fixture, and then the thickness of the glue required on the top needs to be controlled by the fixture, which is less Can not achieve the purpose of waterproofing, more LED light bar becomes harder and not conducive to installation.

5. After the glue is filled, it will take about 12 hours to wait for the glue to dry automatically, and it can be completed in about 8 hours if it is baked. But the baking temperature should not exceed 80 degrees, otherwise the bonding performance of the glue will be affected, thereby affecting the waterproof effect.